United States Department of Agriculture
Natural Resources Conservation Service
Ohio Go to Accessibility Information
Skip to Page Content





Construction Equipment Prices

US Army Corps of Engineers: Document EP 1110-1-8 (Vol. 2)

View and download the "Construction Equipment Ownership and Operating Expense Schedule, Region II" on the US Army Corps of Engineers site from this link.  The document "EP 1110-1-8 (Volume 2)" covers Region II (for the states of Delaware, District of Columbia, Illinois, Indiana, Kentucky, Maryland, Minnesota, Ohio, Virginia and West Virginia).  You can view/download the entire document (very large PDF file) or view each section individually (as PDF files).  The latest date for "EP 1110-1-8" is July 2007.  This document is updated periodically.

Chapter 2 "Methodology for Construction Equipment" contains Hourly Equipment Rates and Operating Expenses for various types of heavy equipment (grouped by manufacturer).  These values are in tabular form in Table 2-1 "Hourly Equipment Ownership and Operating Expense" that begins on Page 2-20.

Data for other regions of the country can be found in other versions of the document "EP 1110-1-8"

Last Modified: 04/29/2008

 

< Back to Engineering